button-en

Search

FaLang Language Switcher

Hot Swipe Carousel

Announcements

Undertaking of the water supply of the Municipality of Aradippou by the Water Board of Larnaka

Undertaking of the water supply of the Municipality of Aradippou by the Water Board of Larnaka

We hereby inform you that, following a decision of the Council of Ministers and an agreement reached between the Water Board of Larnaka (LWB) and the...
Takeover of the water supply of Aradippou Municipality by the Water Board of Larnaka (WBL)

Takeover of the water supply of Aradippou Municipality by the Water Board of Larnaka (WBL)

Dear Citizens of Aradippou,Following the relevant decision of the Council of Ministers and the agreement reached between the Water Board of Larnaka (W...
Prevention ant Protection Measures of the Coronavirus Pandemic

Prevention ant Protection Measures of the Coronavirus Pandemic

Prevention ant Protection Measures of the Coronavirus Pandemic (pdf)
ANNOUNCEMENT – REDUCTION OF WATER RATES BY 5%

ANNOUNCEMENT – REDUCTION OF WATER RATES BY 5%

Dear customers, The Water Board of Larnaka is pleased to inform you that, after evaluating its latest financial results, which were positive, it has d...

The Truth about the Water of Larnaca

Xpert Tabs

water-lab.

Great importance is given by the Board on the daily and systematic monitoring of water quality to protect the public health. According to the results of chemical and bacteriological analysis, carried out by the State General Laboratory on water samples taken by the Health Services of Larnaka from the Board’s sources, the water reservoirs and various points of consumption, water is healthy and suitable in all respects for human consumption.

Read More

water-leak.jpg

Part of the amount of water distributed through the water supply network is not recorded by the water meters of the consumers due to inaccuracies, false indications of water meters and other related causes, or even due to water losses. These losses are mainly due to leaks that cannot be detected in time or damages to the network caused by third parties.

Read More

lwb-projects

  • Under study is the construction of a new water reservoir of capacity 11.000m3, at the same location as the existing ones.
  • The repair and sealing of the existing Board's reservoirs in Klavdia is in progress.

Language Switcher -offcanvas

main menu