New Water Meter Installation

Installation of a new water meter can be done for the supply of water to an independent house/homestead of the building block and each independent apartment, store or other homestead of building block, and to a residential complex and each independent house, shop or any other homestead of the complex.

Water supply to independent houses/homesteads

Applications for the supply of water to independent houses/homesteads must be accompanied by copies of the:

  • topographic drawing,
  • property title,
  • architectural drawings, including ground floor and floors plans, elevations and cross-sections,
  • building permit.

Before installing the water meter, the Board must be paid in advance for the:

  • water supply fees based on the area of the land (Reg. 9 (a and c)),
  • water supply fees based on the area of the building (Reg. 9 (b and c)),
  • costs of installation of the new water meter (Reg. 5 (1)),
  • connection fees (Reg. 6), and
  • bill payment guarantee (Reg. 7).

Water Supply to Building Blocks

Applications for the supply of water to building blocks must be accompanied by copies of the:

  • topographic drawing,
  • property title,
  • architectural drawings, including ground floor, and floors plans, elevations and cross-sections,
  • planning or building permit.

Before the installation of the check water meter, the Board must be paid in advance for the:

  • water supply fees based on the area of the land (Reg. 9 (a and c)),
  • water supply fees based on the area of the building (Reg. 9 (b and c)),
  • costs of installation of the new check meter and the water meters for all individual homesteads of the building block (Reg. 5( 1)),
  • connection fees for all of the above water meters (Reg. 6),
  • bill payment guarantee for the check meter (Reg. 7),

and the applicant must be committed for compliance with the corresponding regulations for the supply of water to building blocks (Reg.13 (2)).

Before the installation of the individual water meters for each apartment, shop or other homestead of the building block:

  • the building permit must be submitted
  • the inspection of the building installations by the Board must be successful, and
  • bill payment guarantee for each individual homestead must be deposited (Reg.7)

Water Supply to Residential Complexes

Applications for water supply to residential complexes must be accompanied by copies of the:

  • topographic drawing,
  • property titles,
  • land-planning drawing,
  • architectural drawings, including plans, elevations and cross-sections,
  • planning or building permit.

Before the installation of the check water meter, the Board must be paid in advance for the:

  • water supply fees based on the area of the land (Reg. 9 (a and c)),
  • water supply fees based on the area of the residential units (Reg. 9 (b and c)),
  • costs of installation of the new check meter and the water meters for the independent residential units of the complex (Reg.5( 1)),
  • connection fees for all of the above water meters (Reg.6),
  • bill payment guarantee for the check meter (Reg.7),

and the applicant must be committed for compliance with the corresponding regulations for the supply of water to residential complexes (Reg.14 (2)).

Before the installation of the water meters for the residential units:

  • the building permit must be submitted,
  • the inspection of the complex installations by the Board must be successful, and
  • bill payment guarantee for each independent residential unit must be deposited (Reg.7)

 

 

For more information, please contact us:

Damianos Mantovanis       Technical Superintendent       tel.24200525
Argyro Philaretou              Technician                  tel. 24200526